YETI products now in stock - Shop Now

Progress on the Worlingworth Depot’s New Workshop!

Tuckwells
Progress on the Worlingworth Depot’s New Workshop!

Over the past 8 months during the construction of the new workshop there has been great progress!

The roof is now securely in place, ensuring protection from the elements.

Inside, the flooring has been completed with impressive precision, poured in two sections that required 36 loads of 8 cubic meter cement trucks.

All overhead doors have been installed, featuring seven on each side and one at the rear, enhancing accessibility and functionality.

Additionally, motion sensor lights have been fitted inside, promoting energy efficiency while ensuring proper illumination.

Currently, efforts are underway to finalize the air compressor lines, which are crucial for powering various tools and equipment.

The drainage system is also being developed to ensure effective water management, further enhancing the workshop’s operational efficiency.

Finally, work has commenced on the outside concrete, marking another step towards completing this essential facility.

The gantry has now been delivered and installed recently. It requires testing before it can be used. The gantry spans the width of the building and can hold 5 tonnes.

We remain committed to delivering a high-quality workspace, with each phase of construction progressing smoothly. Stay tuned for further updates


Book a serviceBook service Request a callbackRequest callback