Building work has now started on the new workshop at the Worlingworth Depot! Our Agricultural Engineers and Apprentices are excited for their new workshop!

Follow along to see how the construction of this workshop will develop…

 

5th January: This was the very start of the process. The concrete that was not needed was being lifted at this stage. Areas marked and set up where the building will be going.

 

12th January: Where all the concrete as been removed that was not needed. Other areas have been roughly levelled ready for the hardcore to be put on top.

 

19th January: Where the areas are continuing to be levelled and hardcore filled in appropriate places. This process is a fairly long process due to the size of the area of the building.